Anderlingen-Ohrel, Germany
Facts & Figures
Genset/engine (R 029): | 1 x TCG 2016 V08C in container 1 x TCG 2016B |
Segment/gas type: | Biogas |
Customer: | Anderlingen, Germany |
Total output: | 400 kWel + 716kWel |
Commissioning: | 2009 + 2007 |
A container-hosted TCG 2016 V08C generates 3,200 MWh of power and 2,552 MWh of heat a year, which are used for the biogas plant.
Additionally, a previously installed TCG 2016 V16B, which runs on gas from the same plant, supplies a local heat network. The integrated MWM biogas processing secures the technology bonus according to the German Renewable Energies Act (EEG).
Contact
MWM Representation in Moscow
Sales & Service
Caterpillar Energy Solutions GmbH
Bldg. 1, 5/2, 1st Kazachiy per.
119017 Moscow
Russian Federation
T: +7 495 234 49 41
E: A00BA9CA09fADAa-BcBeAc8DA08fDCd5B4Ad1DaA55B6A61AcfDaBdBCc7D7
W: www.mwm.com.ru